Installing Ball Gate spring assembly
1) Remove Upper Ball Gate Pivot Screw
2) Remove wooden plug from pivot point, push out from front of Playfield
3) Install existing Torsion spring on new pivot shaft, as shown below
4) Insert Black Nylon sleeve into Ball Gate pivot hole, front of Playfield
5) Install New Gate Pivot into Nylon sleeve from rear
6) Reinstall Front Ball Gate, Be Sure to apply Blue Loc-tite to Both front and back screws.
Tighten screws until Ball gate is too tight then loosen slowly until Ball Gate moves freely.
Post your comment on this topic.